Pertamina Invests US$2.5bn on Geothermal Power Plants

Translator

Editor

Rabu, 8 Juli 2015 05:36 WIB

Presiden RI, Joko Widodo berkeliling usai meresmikan PLTP Kamojang Unit 5 di kamojang, Bandung, Jawa Barat, 5 Juli 2015. PT Pertamina (persero) akan terus melakukan pertumbuhan kapasitas pembangkit listrik panas bumi menjadi 1.026 MW hingga tahun 2019. TEMPO/Aditya Herlambang Putra

TEMPO.CO, Jakarta - State Oil and Gas Company PT Pertamina (Persero) has set aside Rp33 trillion or 2.5 billion US dollars for investment in geothermal power plants development until 2019.

President Director of Pertamina Dwi Soetjipto said here in a release, Sunday, the investment fund will be used to enhance the capacity of the geothermal power plants from 505 Megawatt to 907 Megawatt in 2019.

"We have put the development of geothermal energy in one of our strategic priorities and we've had the blue print for the development until 2019," Dwi Soetjipto said during the inauguration of the Kamojang Geothermal Plant in Garut, West Java.

The 907 MW capacity geothermal power plant is expected to reduce the use of fuel oil until 43,000 barrel oil equivalent per day.

Pertamina has been developing several projects on geothermal power plants namely Kamojang 5 (1x35 MW) and Karaha (1x30MW) in West Java Province; Ulubelu 3 and 4 (2x55 MW) in Lampung Province ; Lumut Balai 1 and 2 (2x55 MW) in South Sumatra Province.

Other geothermal power plant development projects include Lahendong 5 and 6 (2x20 MW), a small-scale plant of Lahendong (2x5 MW) and Sibayak (1x5 MW) in North Sumatra Province; Hululais 1 and 2 (2x55 MW) in Bengkulu Province; and ; Sungai Penuh 1 (1x55 MW) in Jambi Province.

"All of the geothermal projects have a total capacity of 505 MW for which the value of investment reached 2.5 billion US dollars," Soetjipto said.

Those projects are expected to commercially operate from 2015 until 2019 gradually.

By the year 2019, after the projects' development is finished, Pertamina would have a capacity of 907 MW.

Most of the project development is managed by PT Pertamina Geothermal Energy (PGE), PT Pertamina's subsidiary, and carried out by PT Rekayasa Industri.

The construction projects are expected to provide job opportunities for around seven thousands people.

President Joko Widodo (Jokowi), here, Sunday, symbolically inaugurated geothermal power plants (PLTP) located in several regions to increase the country's power supply.

The head of state was accompanied by State Enterprises Minister Rini Soemarno, Coordinating Minister for Maritime Affairs Indroyono Soesilo, Trade Minister Rachmat Gobel, and President Director of the state-owned oil and gas company PT Pertamina Dwi Soetjipto.



ANTARA




Related News

Energy Ministry Raises Biofuel Prices in May

1 hari lalu

Energy Ministry Raises Biofuel Prices in May

The Ministry of Energy and Mineral Resources (ESDM) has set the market index price for biofuel, particularly biodiesel, at Rp12,453 per liter.

Read More

To Go Nuclear, the Public Must be Onboard

18 hari lalu

To Go Nuclear, the Public Must be Onboard

Surveys over the past decade show that nuclear energy as an energy option is being increasingly accepted in Indonesia.

Read More

DPR Energy Commission to Investigate Allegations of Mining Permits Politicization Involving Minister Bahlil

59 hari lalu

DPR Energy Commission to Investigate Allegations of Mining Permits Politicization Involving Minister Bahlil

A number of legislators in DPR's Commission VII, which deals with energy issues, are paying attention to the alleged politicization of mining permit.

Read More

Indonesian Energy Ministry Emphasizes Planned Mining for Sustainability

24 Januari 2024

Indonesian Energy Ministry Emphasizes Planned Mining for Sustainability

Indonesian Energy Ministry emphasizes the importance of planning in the mining sector to ensure environmental, economic, and social sustainability.

Read More

The Dwindling Dream of Low Emissions

24 Januari 2024

The Dwindling Dream of Low Emissions

The government will lower its renewable energy mix target. The goal of low emissions is getting further away.

Read More

IESR Says Energy Sector Potentially Creates 3.2 million of New Job Opportunities

24 Januari 2024

IESR Says Energy Sector Potentially Creates 3.2 million of New Job Opportunities

IESR projected that the energy sector will potentially create millions of new job opportunities.

Read More

Govt to Issue CCS Regulation Soon; Allows for Carbon Storage by Foreign Entities

16 Januari 2024

Govt to Issue CCS Regulation Soon; Allows for Carbon Storage by Foreign Entities

Energy Ministry says that the Presidential Regulation on Carbon Capture and Storage (CCS) outside of upstream oil and gas will soon be released.

Read More

Indonesia Allocates Rp186.9tn for Energy Subsidy Budget in 2024

16 Januari 2024

Indonesia Allocates Rp186.9tn for Energy Subsidy Budget in 2024

The Ministry of Energy and Mineral Resources (ESDM) is allocating Rp186.9 trillion for this year's energy subsidy budget.

Read More

Indonesia Holds 3 Attractions for Investors, Energy Minister Says

24 Desember 2023

Indonesia Holds 3 Attractions for Investors, Energy Minister Says

Energy and Mineral Resources Minister Arifin Tasrif on Friday said that Indonesia has three attractions that can draw investors to the country.

Read More

Minister Retno Marsudi Meets Algerian Counterpart, Talks of Energy Cooperation

21 Desember 2023

Minister Retno Marsudi Meets Algerian Counterpart, Talks of Energy Cooperation

Indonesian Foreign Affairs Minister Retno Marsudi met with her Algerian counterpart Ahmed Attaf in Algiers on Wednesday, Dec. 20.

Read More