LRT Project; BPK Audit Finds Discrepancies in Component Specifications

3 November 2021 13:27 WIB

An LRT train carriage is being evacuated after an accident in the Cibubur - Ciracas Section, East Jakarta, Tuesday 2 November 2021. PT Industri Kereta Api (INKA) is still carrying out evacuation for the LRT train series that had an accident until November 3, 2021 and as many as three carriages The damaged ones will be brought to PT INKA in Madiun, East Java for repairs. ANTARA PHOTOS/Asprilla Dwi Adha

TEMPO.CO, JakartaThe Supreme Audit Agency (BPK) in its latest report on the audit on the light rail transit (LRT) Jabodetabek project on Wednesday, said there were discrepancies in the project’s component specification handled by PT INKA, which also produces 31 train carriages for the LRT. 

The report focuses on the  2017-2019 financial management and obedience of state-railway operator Kereta Api Indonesia (KAI) and subsidiaries in West Java, Jakarta, Banten, and South Sumatra. 

“There were components that were not in accordance with what was required under the Transportation Ministry’s Decree KP 765 tahun 2017,” the BPK report states on November 3. 

The audit agency found that the LRT’s automatic tight lock coupler was not in accordance with the spec, which should have been an automatic device. They also found discrepancies in the construction of the derailment detection system that has a role as an early detection device for possible derailment. 

There were also many pieces of equipment that were not installed as instructed. In its recommendation, the Supreme Audit Agency called for PT INKA to fix the issues and meet the initial specifications that were agreed upon. 

INKA director of development Agung Sedaju to Tempo claims the company did not change the specifications of the LRT project and argues that the BPK report are still disputed. 

Read: Two LRT Jabodebek Trains Collide during Trial Run in East Jakarta

FRANCISCA CHRISTY ROSANA | YOHANES PASKALIS



Infrastructure Development at IKN Costs Rp68tn; PUPR Ministry Admits Concerns over BPK Audit

33 hari lalu

Infrastructure Development at IKN Costs Rp68tn; PUPR Ministry Admits Concerns over BPK Audit

PUPR Ministry is worried about the audit by the Supreme Audit Agency (BPK) over the construction work at the Nusantara Capital City or IKN.


LRT Jabodebek Serves 7mn Passengers in 6 Months of Operation

45 hari lalu

LRT Jabodebek Serves 7mn Passengers in 6 Months of Operation

The Greater Jakarta Light Rail Transit or LRT Jabodebek has operated for more than 6 months.


6 Public Transportation Options in Jakarta for Foreign Tourists

20 Februari 2024

6 Public Transportation Options in Jakarta for Foreign Tourists

The following are 6 public transportation options in Jakarta that can be used by foreign tourists.


Ganjar Pranowo Urges DPR to Intervene on Election Fraud, Sirekap Error Issues

19 Februari 2024

Ganjar Pranowo Urges DPR to Intervene on Election Fraud, Sirekap Error Issues

Ganjar Pranowo asked Commission II of DPR to immediately summon KPU and Bawaslu concerning Sirekap and the alleged fraud in the recent election.


Bawaslu Welcomes Anyone to Audit Sirekap Amid Mounting Pressure

17 Februari 2024

Bawaslu Welcomes Anyone to Audit Sirekap Amid Mounting Pressure

The Head of Bawaslu, Rahmat Bagja welcomed anyone to audit the Recapitulation Information System or Sirekap application.


Transport Ministry Declares Jabodebek LRT Train System as National Vital Object

29 Januari 2024

Transport Ministry Declares Jabodebek LRT Train System as National Vital Object

The light rail transit (LRT) train system connecting Jakarta, Bogor, Depok, and Bekasi (Jabodebek) declared as Indonesia's national vital object


Jabodebek LRT Extends Operational Time, Adds Trips on New Year's Eve

31 Desember 2023

Jabodebek LRT Extends Operational Time, Adds Trips on New Year's Eve

KAI decided to extend the operational time of Jabodebek LRT train until 2:00 a.m. local time and add 32 trips on New Year's Eve.


The Poor State Auditor Selection Process

7 Desember 2023

The Poor State Auditor Selection Process

Yet again, a member of the Supreme Audit Agency is involved in corruption. The system for selecting these state auditors is very poor.


BPK Finds Rp18.19tn State Loss Potentials in First Half

5 Desember 2023

BPK Finds Rp18.19tn State Loss Potentials in First Half

The Supreme Audit Agency (BPK) presented the summary of its first audit results report (IHPS I) of 2023 to the House of Representatives (DPR).


House Member Demands BPK Audit for LRT Jabodebek

17 November 2023

House Member Demands BPK Audit for LRT Jabodebek

LRT Jabodebek is currently under scrutiny for several issues, including worn rails and short circuits triggered by iron powders.