Lupa Kata Sandi? Klik di Sini

atau Masuk melalui

Belum Memiliki Akun Daftar di Sini


atau Daftar melalui

Sudah Memiliki Akun Masuk di Sini

Konfirmasi Email

Kami telah mengirimkan link aktivasi melalui email ke rudihamdani@gmail.com.

Klik link aktivasi dan dapatkan akses membaca 2 artikel gratis non Laput di koran dan Majalah Tempo

Jika Anda tidak menerima email,
Kirimkan Lagi Sekarang

Greater Jakarta LRT Project 77 Percent Complete

Translator

Antara

14 October 2020 05:58 WIB

TEMPO.CO, Jakarta - The construction progress of Greater Jakarta’s light rail transit (LRT) connecting Jakarta, Bogor, Depok, and Bekasi has reached 77 percent, as of September this year, according to PT Adhi Karya (Persero) Tbk.

“The progress of each service line, namely the Cawang-Cibubur route, has reached 91 percent; the Cawang-Kuningan-Dukuh Atas route is 93 percent (complete); the Cawang-East Bekasi route is 87 percent; and the depot is 24 percent (complete),” Adhi Karya corporate secretary Parwanto Noegroho said in a statement issued in Jakarta on Tuesday.

Parwanto said that Adhi Karya has demonstrated its dedication through innovation in the form of the longest and also the first curved-span train line in Indonesia as well as the use of the first and longest U-shaped girder structure in the country.

The longest arch of the rail line, located in Kuningan, South Jakarta, holds the record for the longest span and smallest radius in a curved concrete box train bridge in Indonesia, as recorded by the Indonesian Museum Records (Muri) in November 2019.

It holds another record for the largest load-bearing capacity in Indonesia, demonstrated through axial statistical loading tests on bored pile foundations.

Meanwhile, the U-shaped girder is a construction structure adopted from France, Parwanto said.

"This technology was chosen because of its sleek design, in accordance with the availability of space in dense cities, such as Jakarta. Apart from being slim, this design has various advantages, including earthquake resistance and noise reduction," explained Parwanto.

He said the structure will also provide a walkway or space to walk.

In addition to the U-shaped girder, the Greater LRT will use third rail technology to distribute its electricity supply, so there will be no transverse cables over the line, which will add to the aesthetic and friendliness of the architecture of the city of Jakarta, he informed.

The mass transportation mode is targeted to become operational by July, 2022.

Read also: KAI Disburses Rp4.2tn to Accelerate LRT Jabodebek Construction

ANTARA

LRT


LRT Jabodebek Serves 7mn Passengers in 6 Months of Operation

45 hari lalu

LRT Jabodebek Serves 7mn Passengers in 6 Months of Operation

The Greater Jakarta Light Rail Transit or LRT Jabodebek has operated for more than 6 months.


6 Public Transportation Options in Jakarta for Foreign Tourists

20 Februari 2024

6 Public Transportation Options in Jakarta for Foreign Tourists

The following are 6 public transportation options in Jakarta that can be used by foreign tourists.


Transport Ministry Declares Jabodebek LRT Train System as National Vital Object

29 Januari 2024

Transport Ministry Declares Jabodebek LRT Train System as National Vital Object

The light rail transit (LRT) train system connecting Jakarta, Bogor, Depok, and Bekasi (Jabodebek) declared as Indonesia's national vital object


Jabodebek LRT Extends Operational Time, Adds Trips on New Year's Eve

31 Desember 2023

Jabodebek LRT Extends Operational Time, Adds Trips on New Year's Eve

KAI decided to extend the operational time of Jabodebek LRT train until 2:00 a.m. local time and add 32 trips on New Year's Eve.


Indonesian Govt to Integrate Jabodebek Public Transportations

27 September 2023

Indonesian Govt to Integrate Jabodebek Public Transportations

The public transportation system connecting Jakarta, Bogor, Depok, and Bekasi (Jabodebek) will be integrated in the upcoming month.


Govt Talks of Developing Underground LRT in Bali

25 September 2023

Govt Talks of Developing Underground LRT in Bali

The government plans to develop an underground light rail transit (LRT) in Bali.


Jakarta Conducts Trial Run for Account-Based Ticketing in Transjakarta, MRT, and LRT Jakarta

18 September 2023

Jakarta Conducts Trial Run for Account-Based Ticketing in Transjakarta, MRT, and LRT Jakarta

The provincial government of Jakarta conducted a trial run for account-based ticketing (ABT) through the Jaklingko application.


Adhi Karya Finishes Constructing LRT Jabodebek with 44km Track

29 Agustus 2023

Adhi Karya Finishes Constructing LRT Jabodebek with 44km Track

PT Adhi Karya (Persero) Tbk (IDX: ADHI) completed the construction of the LRT Jabodebek with a track that spans 44 kilometers.


Jabodebek LRT Starts to Serve Passengers on Monday

27 Agustus 2023

Jabodebek LRT Starts to Serve Passengers on Monday

The Jabodebek LRT (Light Rail Transit) is scheduled to start serving passengers from Monday, August 28, 2023.


Budi Karya: Jabodebek LRT to Operate 'Conservatively'

23 Agustus 2023

Budi Karya: Jabodebek LRT to Operate 'Conservatively'

Minister of Transportation Budi Karya Sumadi on Tuesday reviewed the readiness of the Jakarta, Bogor, Depok, Bekasi (Jabodebek) LRT service