Lupa Kata Sandi? Klik di Sini

atau Masuk melalui

Belum Memiliki Akun Daftar di Sini


atau Daftar melalui

Sudah Memiliki Akun Masuk di Sini

Konfirmasi Email

Kami telah mengirimkan link aktivasi melalui email ke rudihamdani@gmail.com.

Klik link aktivasi dan dapatkan akses membaca 2 artikel gratis non Laput di koran dan Majalah Tempo

Jika Anda tidak menerima email,
Kirimkan Lagi Sekarang

Cikampek-Palimanan Toll Road to be Tested

5 April 2015 11:00 WIB

Pekerja berdiri di jalan Tol Trans Jawa Kertosono-Mojokerto seksi satu di Tembelang, Jombang, Jawa Timur, 23 Juli 2014. Tol trans Jawa seksi satu rencana bisa dilalui kendaraan saat mudik Lebaran, belum bisa digunakan meski pembangunan sudah 90 persen. ANTARA/Syaiful Arif

TEMPO.CO, Jakarta - Public Works and Public Housing Minister Basuki Hadimuljono said the Cikampek-Palimanan toll road project has progressed to 92 percent construction. According to Basuki, the toll road will be fully operational before this year’s lebaran or Eid’s homecoming season.

Basuki revealed that toll road investor PT Lintas Marga Sedaya has two months to complete the construction.

“There will be a trial for the toll road next week, so that it can operate in early June,” Basuki said at the construction site, Cikampek, West Java, on Saturday, April 4, 2015.

Abdul Gani Gazali, the head of the toll-road regulatory agency (BPJT) at the Public Works and Public Housing Ministry, said the trial will be started from Sumberjaya-Palimanan section.

Lintas Marga Sedaya vice president director Hudaya Arryanto said 25 kilometers of the toll road is still under construction. In addition, about 9 out of 99 toll road bridges are yet completed. Hudaya has set a target that all of the toll road sections will be operational by the end of May.

Basuki said the toll road is expected to reduce the traffic congestion by 50 percent at Java north coast highway (Pantura) during the homecoming season. Basuki added that the toll road was designed to facilitate 25,000 vehicles per day.

ALI HIDAYAT




E-ticketing on Toll Roads; Police Log Thousands of Vehicles Exceed Speed Limit

5 April 2022

E-ticketing on Toll Roads; Police Log Thousands of Vehicles Exceed Speed Limit

Jakarta Traffic Police Director says thousands of vehicles were caught on E-TLE or e-ticketing cameras exceeding the speed limit on toll roads.


Seven Longest Toll Roads in Indonesia

10 September 2021

Seven Longest Toll Roads in Indonesia

Indonesia has many toll roads stretching up to hundreds of kilometers. Here is the list of Indonesia's seven longest highways.


Fares in 13 Toll Roads Will Increase

11 Maret 2019

Fares in 13 Toll Roads Will Increase

The last time said toll roads raised their tariffs was in late 2017.


Main Obstacle of Toll Road Constructions Outside the Java Island

22 Februari 2019

Main Obstacle of Toll Road Constructions Outside the Java Island

Public Works and Public Housing Ministry is close to completing several toll road construction projects in reaching its goal of 1,000-kilometers.


Jakarta-Cikampek Elevated Toll Road to be Completed in May 2019

23 Desember 2018

Jakarta-Cikampek Elevated Toll Road to be Completed in May 2019

Chief Executive of Jalanlayang Jakarta-Cikampek is optimistic that construction of elevated Jakarta-Cikampek toll road will be completed in May 2019.


Jokowi Request Regional Assistance in Trans-Sumatera Toll Road

15 Desember 2018

Jokowi Request Regional Assistance in Trans-Sumatera Toll Road

President Jokowi expects regional governments to render assistance in the Trans-Sumatera toll road construction.


Bogor Outer Ringroad Section II B Construction Begins

11 September 2015

Bogor Outer Ringroad Section II B Construction Begins

The construction of the Section II B BORR will be followed by
the construction of Section III in 2016-2017.


Jokowi Inspects Palembang-Indralaya Toll Road Construction Works

7 September 2015

Jokowi Inspects Palembang-Indralaya Toll Road Construction Works

President Joko Widodo in Ogan Ilir District, South Sumatra
inspected construction works of Palembang-Indralaya toll road


Next Year, Tender for Toll Road Project in Batam to be Held

19 Agustus 2015

Next Year, Tender for Toll Road Project in Batam to be Held

A tender would be held next year for a toll road project in
Batam.


Trans-Java to Be Completed in 2018: Public Works Ministry

6 Agustus 2015

Trans-Java to Be Completed in 2018: Public Works Ministry

The government is currently focusing on speeding up land
acquisition process.