Lupa Kata Sandi? Klik di Sini

atau Masuk melalui

Belum Memiliki Akun Daftar di Sini


atau Daftar melalui

Sudah Memiliki Akun Masuk di Sini

Konfirmasi Email

Kami telah mengirimkan link aktivasi melalui email ke rudihamdani@gmail.com.

Klik link aktivasi dan dapatkan akses membaca 2 artikel gratis non Laput di koran dan Majalah Tempo

Jika Anda tidak menerima email,
Kirimkan Lagi Sekarang

Jagorawi Toll Road Paralyzed due to Heavy Rain

Translator

Editor

13 January 2014 14:06 WIB

Traffic congestion in Jagorawi toll road. ANTARA/Saptono

TEMPO.CO, Jakarta - Heavy rain that has been showering Jakarta since Sunday, January 12, 2014 until today, January 13, has caused a number of streets to flood. As a result, the traffic flow in the Jagorawi Toll Road suffers a total gridlock.

Head of Public Relations for PT Jasa Marga, Wasta Gunadi, said that the main cause of the gridlock is due to the overflow from Cipinang River. "The Cipinang River overflowed at kilometer 4, causing cars difficult to pass through," said Wasta to Tempo, Monday, January 13, 2014.

The gridlock in Jagorawi toll road happened in both directions, from Bogor to Jakarta and vice versa. "The heavy traffic spans up to the Cimanggis toll gate," he said.

Meanwhile, heavy traffics are also happening in the Inner Ring toll road. Vehicles travelling to Grogol got stuck in a congestion starting from Cawang. "The stress points are from Cawang-Tegalparang and from Grogol-Semanggi," said Wasta.

AFRILIA SURYANIS




E-ticketing on Toll Roads; Police Log Thousands of Vehicles Exceed Speed Limit

5 April 2022

E-ticketing on Toll Roads; Police Log Thousands of Vehicles Exceed Speed Limit

Jakarta Traffic Police Director says thousands of vehicles were caught on E-TLE or e-ticketing cameras exceeding the speed limit on toll roads.


Seven Longest Toll Roads in Indonesia

10 September 2021

Seven Longest Toll Roads in Indonesia

Indonesia has many toll roads stretching up to hundreds of kilometers. Here is the list of Indonesia's seven longest highways.


Fares in 13 Toll Roads Will Increase

11 Maret 2019

Fares in 13 Toll Roads Will Increase

The last time said toll roads raised their tariffs was in late 2017.


Main Obstacle of Toll Road Constructions Outside the Java Island

22 Februari 2019

Main Obstacle of Toll Road Constructions Outside the Java Island

Public Works and Public Housing Ministry is close to completing several toll road construction projects in reaching its goal of 1,000-kilometers.


Jakarta-Cikampek Elevated Toll Road to be Completed in May 2019

23 Desember 2018

Jakarta-Cikampek Elevated Toll Road to be Completed in May 2019

Chief Executive of Jalanlayang Jakarta-Cikampek is optimistic that construction of elevated Jakarta-Cikampek toll road will be completed in May 2019.


Jokowi Request Regional Assistance in Trans-Sumatera Toll Road

15 Desember 2018

Jokowi Request Regional Assistance in Trans-Sumatera Toll Road

President Jokowi expects regional governments to render assistance in the Trans-Sumatera toll road construction.


Bogor Outer Ringroad Section II B Construction Begins

11 September 2015

Bogor Outer Ringroad Section II B Construction Begins

The construction of the Section II B BORR will be followed by
the construction of Section III in 2016-2017.


Jokowi Inspects Palembang-Indralaya Toll Road Construction Works

7 September 2015

Jokowi Inspects Palembang-Indralaya Toll Road Construction Works

President Joko Widodo in Ogan Ilir District, South Sumatra
inspected construction works of Palembang-Indralaya toll road


Next Year, Tender for Toll Road Project in Batam to be Held

19 Agustus 2015

Next Year, Tender for Toll Road Project in Batam to be Held

A tender would be held next year for a toll road project in
Batam.


Trans-Java to Be Completed in 2018: Public Works Ministry

6 Agustus 2015

Trans-Java to Be Completed in 2018: Public Works Ministry

The government is currently focusing on speeding up land
acquisition process.